PCSD PCSD
PCSD PCSD PCSD PCSD PCSD PCSD PCSD PCSD
PCSD
PCSD
PCSD
PCSD
PCSD
PCSD
PCSD
PCSD
PCSD
PCSD
PCSD
PCSD
PCSD
PCSD
PCSD
PCSD
PCSD
PCSD PCSD PCSD PCSD
PCSD
Aspire Pacific Academy Phase I: Aspire
Site 5721-5753 Pacific Ave & 2518-2553 E. 58th St.
Neighborhood Huntington Park
Seats Created 580
Program The building is designed with 20 classrooms and 4 auxiliary rooms as well as a multi-purpose room on the ground floor.
Architect Franco & Associates, Inc.
Development Budget $9,600,000
General Contractor

Blackwell Construction

School Opening September 2010
Acres

0.735 acres; 2.8 acres for full campus

58th and Pacific

Description:

This project will provide a secondary school facility for Aspire Public Schools.  The site is located in downtown Huntington Park just east of Alameda Street.  The proposed building will create 580 seats serving grades 6-12.  The building is designed with 20 classrooms and 4 auxiliary rooms as well as a multi-purpose room on the ground floor.  The school will have 31 on-site parking spaces and will have a joint-use agreement with the Aspire “State School” located across 58th Street for 26 more parking spaces.

The site is currently a truck dealership and paved parking.  The proposed design combines 5 lots and requires that the City of Huntington Park vacate the alley running N/S through the lots. 

Note that this school is part of a larger campus, to be owned and operated wholly by Aspire Public Schools. Phase 2 of the project includes a state financed secondary school, gymnasium and soccer field opening in 2012 with 400 student capacity.

No API data available as of June 2011

Map of location

 

 

PCSD
How We Work | Projects | About Us | Schools | Funders | Contact Us | Home