PCSD 58th and Pacific Phase II
Site 5721-5753 Pacific Ave & 2518- 2553 E.58th St.
Neighborhood Huntington Park
Seats Created 400
Program 16 classrooms, 2 auxiliary rooms, multi-purpose room, gymnasium, soccer field
Architect Franco and Associates Inc.
Development Budget $17.5 M including phase I
General Contractor Blackwell Construction

58th and Pacific Phase II

This project will provide a secondary school facility, a gymnasium and a soccer field for Aspire Public Schools.  The site is located in downtown Huntington Park just east of Alameda Street.  The proposed school building will create 400 seats serving grades 7-12.  The building is designed with 16 classrooms and 2 auxiliary rooms as well as a multi-purpose room on the ground floor.  The gymnasium has a capacity of 560 seats and will also function as a performing arts space.  The soccer field is approximately 64,000 sq ft and will be laid with artificial turf. The campus will have 69 on-site parking spaces This site will be built to Field Act requirements and will strive for LEED certification.

The site is currently a truck dealership, maintenance shop and paved parking.  There is also a residence on site.  The proposed design combines 14 lots and requires that the City of Huntington Park vacate a portion of 58th Street to accommodate the soccer field. 

Note that this school is part of a larger campus, to be owned and operated wholly by Aspire Public Schools. Phase 1 of the project includes a privately financed secondary school opening in 2010 with 560 student capacity.